ADDENDUM No. 1
Supply, Delivery, Installation and Operation of Computers, Printers, UPS and Solar Power Supply in Primary Schools of 2 Districts in each Province (Contract No.: IFA No. 05/NTA/2074/075)
(Date of issue of Addendum No 1: 1st November 2017)
Pursuant to Clause No. 9 of ITB of bidding document, all prospective bidders are hereby informed that following are the amendment made in the Bidding Documents for above said contract:
Reference | Original Provision | Amended Version | ||||||||||||||||
Price Schedule For Goods | PC with Intel Core i5 – 1 No. in each school | PC with Intel Core i5 – 2 Nos. in each school. Revised Price Schedule for Goods is available at the address given inn clause no. 8.1 of Section II: Bid Data Sheet. | ||||||||||||||||
Price Schedule For Goods | 21″ display Monitor, Key Board and Mouse– 2 No. in each school | Removed. | ||||||||||||||||
Technical Specification of Desktop Computer (PC) |
|
|
||||||||||||||||
Technical Specification of Printer |
|
|
||||||||||||||||
Delivery and Completion Schedule- Page no. 5-2 of Section 5 : Schedule of Requirements | The bidder shall supply, deliver and install at least fifty (50) percent of the required quantity in each district within three months after the date of agreement. The bidder shall supply, deliver and install all Goods within six months after the date of agreement | The bidder shall supply, delivery and install the Goods as per Purchaser’s instruction in following phases :
Phase I: In schools, where power supply facility and Internet facility are available. Phase II : In schools, where power supply facility and Internet facility can be managed and; Phase III : In schools, where power supply is not available and Solar power will be applicable |
||||||||||||||||
GCC clause no. 32.1 | None | The Purchaser can increase or decrease the quantity to be supplied under the Contract. | ||||||||||||||||
Clause no ITB 19.2 of Bid Data Sheet | A Manufacturer’s Authorization letter is only required for the following items:
(i) Computer (ii) Printer
|
A Manufacturer’s Authorization letter is only required for the following items:
(i) Computer (ii) Printer (iii) UPS (iv) Solar |
||||||||||||||||
Clause no. 24.1 of Section : Bid Data Sheet | The deadline for bid submission is:
Date: 05 November 2017 Time: 12:00 hrs. Local Time (NST) |
The deadline for bid submission is:
Date: 14 November 2017 Time: 12:00 hrs. Local Time (NST) |
||||||||||||||||
Clause no. 27.1 of Section : Bid Data Sheet | The bid opening shall take place at:
Date: 05 November 2017 Time: Immediately after the Bid submission deadline. Place: Meeting Hall, NTA |
The bid opening shall take place at:
Date: 14 November 2017 Time: 13:00 hrs. Local Time (NST) Place: Meeting Hall, NTA |